Tender & Notice

Co

Reference Manuals/Notices
Circular Number 789
Circular Number 792

RGPPL Tariff Petition for the period 2019-2024.

RGPPL Revised Tariff Petition for the period 2014-2019.

GCC and ITB for O&M Works

GCC for Civil Works

Reference Safety Manual

RGPPL's Tariff petition for the period 2014-19

Regulation Notice to MSEDCL

RGPPL Regulation Notice-2 MSEDCL dated 07.06.2019

Regulation Notice MSEDCL 21.05.2019


 

Latest Tenders
Hiring of Passenger Vehicles (Hard-Top Jeep Type) at RGPPL site (RGPPL/C&M/CS-2868/OT-133-Category-I)
BOD: 09.06.2020
Procurement of Steel Angles for Structural Work (RGPPL/C&M/PUR/OT-63) BOD: 16.06.2020
Hiring of multi-utility vehicles (Other than Passenger Jeeps) (RGPPL/C&M/CS-2851/OT-126-Category-I) BOD: 02.06.2020
Hiring of multi-utility vehicles (Other than Passenger Jeeps) (RGPPL/C&M/CS-2851/OT-134-Category-II) BOD: 02.06.2020
Hiring of multi-utility vehicles (Other than Passenger Jeeps) (RGPPL/C&M/CS-2851/OT-135-Category-III) BOD: 02.06.2020
Hiring of multi-utility vehicles (Other than Passenger Jeeps) (RGPPL/C&M/CS-2851/OT-136-Category-IV) BOD: 02.06.2020
Procurement of Galvanized Scaffolding Pipes (RGPPL/C&M/PUR/OT-48)

Corrigendum 1

Corrigendum 2

Corrigendum 3

Corrigendum 4

Corrigendum 05

Corrigendum 06

Extended BOD: 22.05.2020
Procurement of High Energy Manual Isolation Valves for phase 2 steam turbines (RGPPL/C&M/PURCHASE/OT-57)

Corrigendum 1

Extended BOD: 29.05.2020

Extended BOD: 05.06.2020

Waterproofing of Buildings in Housing Colony (RGPPL/C&M/CS-2863/OT-129)

Corrigendum 01

BOD: 09.06.2020
Procurement of B-16 Fasteners for HRSG Drum Manhole and FV-157 valve (RGPPL/C&M/PUR/OT-50)

Corrigendum-01

Corrigendum 02

Corrigendum 03

Corrigendum 04

Corrigendum 05

Extended BOD: 26.05.2020
Procurement of 3 KVA Industrial UPS with Bypass Line Transformer (RGPPL/C&M/PURCHASE/OT-59) BOD: 26.05.2020
Procurement of Strainer Basket Element for Seawater Application (RGPPL/C&M/PURCHASE/OT-61) BOD: 26.05.2020
Procurement of SS 304L Pipes, Elbows & sheets for HRSG Tube Bundling & Baffle Plates (RGPPL/C&M/PURCHASE/OT-60) BOD: 26.05.2020

Procurement of PP Lined MS Pipes for Handling Acid, Caustic & Chemicals (RGPPL/C&M/PURCHASE/OT-58)

Corrigendum 01

Extended BOD: 29.05.2020
Procurement of High Energy Manual Isolation Valves for Phase 2 Steam Turbines (RGPPL/C&M/PURCHASE/OT-57) BOD: 19.05.2020

AMC for Vibration Measurement, Analysis & Dynamic Balancing of Rotating Machines (RGPPL/C&M/CS-2860/OT-132

Corrigendum 01

Corrigendum 02

Extended BOD: 05.06.2020
Design, supply, erection & commissioning of 500 KLD Capacity MBR Technology Based Sewage Treatment plant at RGPPL Township (RGPPL/C&M/CS-2841/OT-122 dtd. 17/04/2020)

Addendum 01

Corrigendum 01

BOD: 08.05.2020

Construction of Remaining work of Warehouse 4"  (RGPPL/C&M/CS-2855/OT-130)

Corrigendum 01

Corrigendum 02

Extended BOD: 05.06.2020
Biennial Contract for maintenance of RGPPL owned vehicles at site (RGPPL/C&M/CS-2845/OT-124)

Addendum no. 1

Corrigendum 01

Corrigendum 02

Corrigendum 03

Corrigendum 04

BOD: 09.06.2020
Procurement of Galvanized Scaffolding Pipes (RGPPL/C&M/PUR/OT-48)

Corrigendum 1

Corrigendum 2

Corrigendum 3

Corrigendum 4

Corrigendum 05

Extended BOD: 11.05.2020
Construction of Foundation for CGL Transformer RGPPL/C&M/CS-2862/OT-128

Corrigendum 01

Corrigendum 02

Corrigendum 03

Extended BOD: 22.05.2020
Procurement of Power Quality & Motor Analyzer (RGPPL/C&M/PUR/OT-53)

Technical addendum

Corrigendum 1

Corrigendum 2

Corrigendum 3

Corrigendum 04

Extended BOD: 29.05.2020
Procurement of Handheld Infrared Thermal Imaging Camera (RGPPL/C&M/PUR/OT-55)

Corrigendum 1

Corrigendum 2

Corrigendum 3

Corrigendum 4

Extended BOD: 26.05.2020
Polyurea Waterproofing in Housing Colony (RGPPL/C&M/CS-2831/OT-119)

Corrigendum-01

Corrigendum 02

Corrigendum 03

Corrigendum 04

Corrigendum 05

Extended BOD: 05.06.2020
Procurement of Tarpaulin (RGPPL/C&M/PURCHASE/OT-52) BOD: 17.03.2020
Procurement of Hugh Energy Pneumatic Drain Valve Assemblies for Phase 2 ST and Boiler Area (RGPPL/C&M/PURCHASE/OT-50)

Technical Addendum

BOD: 10-04-20
Procurement of IBR certified Pipes & Fittings for HRSG Drain & Vent Lines (RGPPL/C&M/PURCHASE/OT-56) BOD: 20.03.2020
Procurement of Moulded Polyethylene Water Storage Tanks (RGPPL/C&M/PURCHASE/OT-49) BOD: 17.03.2020
Procurement of PFA Lined Ball Valves for Seawater & Chemical Handling (RGPPL/C&M/PURCHASE/OT-54) BOD: 20.03.2020
Inspection, Repair & Refurbishment of High-Pressure Valves of HRSG (RGPPL/C&M/CS-2832/OT-120) BOD: 17.03.2020
Inspection, Repair & Refurbishment of used shafts of Intake Makeup Water Pump and cooling tower circulating Water Pumps (RGPPL/C&M/CS-2824/OT-121)

Corrigendum-01

Corrigendum-02

Corrigendum 03

Corrigendum 04

Corrigendum 05

Extended BOD: 05.06.2020
Procurement of Medium Voltage Termination & Jointing Kits (RGPPL/C&M/PURCHASE/OT-45) BOD - 24.12.2019
RGPPL/C&M/PURCHASE/OT-44 for Procurement of Air Conditioners for Field Hostel & Recreation Centre BOD - 03.12.2019
RGPPL/C&M/PURCHASE/OT-43 for Procurement of Battery Chargers for PEECC & Station Battery Banks BOD - 06.12.2019
Procurement of Structural Steel (RGPPL/C&M/PURCHASE/OT-41) BOD: 12.11.2019
Procurement of Polypropylene (PP) Lined FRP Acid Storage Tanks for Cooling Tower 2 & 3 (RGPPL/C&M/PURCHASE/OT-40) BOD: 12.11.2019
Procurement of Aluminium Roofing Sheets

Corrigendum-01

Corrigendum-02

Corrigendum-03

BOD: 11.10.2019
Extended BOD: 15.11.2019
Procurement of Security Cabins for CISF –Porta cabins

Corrigendum-01

Corrigendum-02

Corrigendum-03

BOD: 11.10.2019
Extended BOD: 19.11.2019
Civil Works for New MV Switch Gear Building at RGPPL

Corrigendum-01

Corrigendum-02

BOD: 01/10/2019
Extended BOD: 22.10.2019
Procurement of Teflon Coated High Tensile Fasteners (RGPPL/C&M/PURCHASE/OT-35)

Corrigendum-01

Corrigendum-02

Corrigendum-03

Corrigendum-04

BOD: 23/08/2019
Extended BOD: 15.10.2019
Procurement of Desktop PCs, All in one Desktop PCs and Laptop (RGPPL/C&M/PURCHASE/OT-42) BOD: 15.10.2019
Procurement of Carbon Steel Pipes & Fittings for Intake Make-Up Pump Discharge & Chilled Water PHE Inlet & Outlet Lines (RGPPL/C&M/Purchase/OT-39) BOD: 11.10.2019
ProcurementRubber lining of 5mm thickness on Phase-1 Bulk Acid Storage tank of capacity 130MT at RGPPL site. (RGPPL/C&M/CS-2713/OT-104)

Corrigendum-01

BOD: 27.08.2019
Extended BOD- 10.09.2019 @3.30 P.M.
Annual Rate contract for supply of Hydrogen Gas in Cylinders (RGPPL/C&M/PURCHASE/OT-37)

Corrigendum-01

BOD: 20/09/2019
BOD: 24/12/2019
Procurement of Self-Propelled Articulating Boom Lift (RGPPL/C&M/PURCHASE/OT-30)

Corrigendum-01

Corrigendum-02

Corrigendum-03

Corrigendum-04

BOD: 30.08.2019
Procurement of Station Battery for Block-1 & 2 and PEECC battery for block-1 (RGPPL/C&M/PURCHASE/OT-28)

Corrigendum-01

Corrigendum-02

Corrigendum-03

Extended BOD: 02.08.2019
Procurement of LT Power Cable (RGPPL/C&M/PURCHSE/OT-34) BOD: 09/08/2019
Construction of Foundation for CGL Transformer (RGPPL/C&M/CS-2770/OT-98) BOD: 30/07/2019
RCC Road in Plant Area of RGPPL (RGPPL/C&M/CS-2776/OT-101) BOD: 30/07/2019
Procurement of Heat Exchanger (Cooler) for HT Motors of BFPs (RGPPL/C&M/PURCHASE/OT-31)

Corrigendum-01

Corrigendum-02

Extended BOD: 19.07.2019
Procurement of Moulded Polyethylene Water Storage Tanks (RGPPL/C&M/PURCHASE/OT-29)

Corrigendum-01

BOD: 28.06.2019


Power Business Billing Information
Details/Information uploaded as per Clause (7) of Regulation 30 of CERC (Terms & Conditions of Tariff) Regulation 2014